Infrastructure & construction
The hardest problemin robotics isa building site.
Sites are unstructured, which also makes them the biggest prize. Progress monitoring, survey and site robotics are advancing fast and failing quietly. We tell you which are ready for your sites, and build the ones that are close.
Where we look hardest
An example, not a client result.
Where we look hardest
Which survey and site robots are ready for mud, dust and changing layouts?
Progress and survey
Automated capture, compared against plan with current perception models.
Site robotics
An honest assessment of mobile platforms in mud, dust and changing layouts.
Safety intelligence
Vision models for hazard detection: precision, recall and the cost of being wrong.
Illustrations show example states, not client results.
Labs in infrastructure
What your first year looks like.
It starts with one report. What it covers, what we test before it reaches you, and the kind of concepts that tend to follow.
Quarter 1
In the first report
- Where automated capture against plan is accurate enough to replace a survey walk
- Which mobile platforms cope with live sites, and which only with demos
- The state of hazard detection, and what a missed hazard costs you
Before it reaches you
Tested in the lab
- Perception models comparing captured scans with your drawings
- Mobile platforms on rough ground, in dust and around moved obstacles
- Hazard detection scored for precision and recall on footage like yours
Two or three a year
Likely concepts
- Overnight progress against plan, level by level
- A site patrol for the routes a robot can handle today
- Hazard alerts tuned to the misses that matter most
Built when you say go. Then run by Edge Expert Services on the Edge platform.How an engagement works
Closest work
The closest thing we've built.
We haven't published a construction build yet. This is the closest in method.
Start with one report
Find out what's ready for your sites.
Tell us about your projects and what you capture today. We'll come back with what the first report would cover, and what it would cost.